|
Constructing a New "Crossover Bridge" March-May, 2024 |
|
Lumber is loaded for transport to the build site. No less than 6 subsequent trips were made to the hardware store for more stuff.
|
|
Future Trailmen lends a hand
|
|
Measure once, waste lumber
|
|
Measure twice, cut once
|
Both basses complete
|
|
Fitting the bridge beams
|
|
Trailmen starts painting
|
|
|
|
|
|
Fishing ropes through the bridge beams
|
|
|
|
We learned how NOT to build a bridge at least 3 times before figuring out a method that worked.
|
|
It works!
|
|
Testing the storage configuration
|
Adding the rope handles
|
|
More testing
|
|
|
|
|
|
|
The ultimate test
|
|
Victory!
|
Painting finished
|
Wheels have been installed
|
|
|
|
Lettering finished
|
|
Collapsed and ready for transport
|
|
Loaded up for the trip to SBC
|
|
|
|
Finally stored at SBC and awaiting her debut at the 2024 Court of Honor!
|
|
Set up and ready for the 2024 Court of Honor
|